GeneralElectricのインスタグラム(generalelectric) - 2月16日 23時30分


Today, #GEInstaWalk is headed to Orange Blue Terminal in Eemshaven, Netherlands for an inside look at the very beginnings of the installation process. Here, the nacelles, towers and blades for our Haliade wind turbines met for the first time. They’re now being loaded into the first vessel destined for Merkur Wind Farm—a huge milestone in the lifecycle of our Haliades. Photographers @nk7, @floatfish and @finn join us to capture the excitement. Head to our Story for more behind the scenes, and tune in Monday for a look at how additive manufacturing is bringing the production of commercial jet engines to the next level. Video by @nk7
#Eemshaven #Netherlands #Haliade #renewables #energyflow


[BIHAKUEN]UVシールド(UVShield)

>> 飲む日焼け止め!「UVシールド」を購入する

3,161

33

2018/2/16

GeneralElectricを見た方におすすめの有名人